14 June, 2010

Slab #3

Another week and another slab. This one is inside the existing house, bringing the sunken floor to the same level as the rest of the house, and rests on the old suspended timber floor. Like the extension slab it goes in slightly green and dries to a brown, but it will also need a bit of a polish before the work is done.





The corner of the house where the stairwell is going has been cut back to the new lines, so you can see where the tower will come out of the basement and up to the top of the roof.


The grand boulevarde is now clear, from the front door to the back of the house. There'll be some cupboards going along the side eventually (and the holes in the floor will be covered).